Complete field installation guide for a 5-device residential perimeter, four foundation corners plus center-north mid-wall, connected by a continuous ½″ PVC water loop in an 18″ trench.
Safety: This system uses 12VAC landscape power and controls water solenoid valves around your foundation perimeter. Always install the transformer on a GFCI-protected outdoor outlet. Each solenoid valve has a blue manual override tab, rotate it to manually close the valve in an emergency. Commission and verify all devices before opening the main water shutoff.
Step 3 - Install PVC Water Main
½″ Schedule-40 PVC from manual shutoff through each valve box.
Warning: Use Teflon tape + pipe dope on ALL NPT threaded connections, solenoid valve ports are ¾″ NPT.
Warning: Allow PVC cement to cure 30 minutes before applying any water pressure.
Reference notes
- Solenoid valve: ¾″ NPT male inlet and outlet, use ¾″ female adapters to connect to ½″ PVC runs
- Reducing bushings: use ¾″ FPT × ½″ MPT if needed at valve connections
Procedure
- At the garage entry point, install the manual ball shutoff valve on the main supply line. This is your emergency override.
- Run ½″ PVC from the shutoff along the trench bottom toward the SW corner valve box pocket.
- At each valve box location, cut the PVC and install the latching solenoid valve inline. The arrow on the valve body must point in the direction of water flow.
- Continue PVC from the outlet side of each solenoid valve to the next box, then to the drip emitter stub-out.
- At the final emitter location, install a ½″ end cap or drip emitter fitting.
- Pressure test the full PVC run at 40 PSI for 10 minutes before backfilling, check every joint for seeps.